Skip to main content

NASA completes prelaunch test of its mega moon rocket

NASA has completed what may have been the final ground test of its next-generation Space Launch System (SLS) rocket before its much-anticipated maiden mission to the moon.

It comes after a failed attempt at the same so-called “wet dress rehearsal” in April, when a number of issues caused the test to be called off.

Monday’s crucial test took place at Launch Pad 39B at the Kennedy Space Center in Florida, starting in the morning and concluding at 7:37 p.m. ET.

The entire procedure took about 12 hours and marked the first time for the SLS rocket’s propellant tanks to be fully loaded with fuel. The test ended with a mock countdown, a critical period of any rocket launch when many activities take place in rapid succession.

Today's #Artemis I wet dress rehearsal activities concluded after a modified countdown configuration and successfully adding propellant to the rocket. We will review the data and are meeting to discuss next steps. For updates: https://t.co/rZxnWJ0Kbi pic.twitter.com/dKtFZeVWDF

— NASA (@NASA) June 21, 2022

As the test has only just finished, information on how it went is scarce. Indeed, NASA is now analyzing the data gathered during the test to determine if it can launch the rocket and Orion spacecraft toward the moon in late August, or if more work needs to be carried out on the vehicle.

An initial NASA report released about an hour after the test finished suggested that overall it went well, though it wasn’t all smooth sailing.

The agency said that during propellant loading operations early on Monday, engineers spotted a hydrogen leak in a component that attaches an umbilical from the tail service mast on the mobile launcher to the SLS rocket’s core stage. April’s test also featured a hydrogen leak though it’s not yet clear if the two issues are linked.

NASA said it tried to repair Monday’s leak using a warming and chilling process to realign the seals, but the effort failed. Determined to proceed with the test, engineers found a way to mask the leak-related data that in a real launch situation would have prompted the computer to pause the countdown.

The engineers’ actions enabled the team to “resume with the final 10 minutes of the countdown, called terminal count. During the terminal count, the teams performed several critical operations that must be accomplished for launch including switching control from the ground launch sequencer to the automated launch sequencer controlled by the rocket’s flight software, an important step that the team wanted to accomplish.”

The test clearly went better than the effort in April, but NASA will have to address the valve problem, among other issues that may have surfaced during Monday’s procedure.

NASA will provide a full account of the test at a media teleconference at 11 a.m. ET on Tuesday, June 21. You can watch the broadcast on the video player below or via NASA’s website.

The space agency will use the SLS rocket to power the Orion spacecraft on an uncrewed flyby of the moon in the Artemis I mission, which could launch in late August. Artemis II will send a crew on the same flight path, while Artemis III will put the first woman and first person of color on the lunar surface in a mission that will herald a new era of human space exploration.

NASA Live: Official Stream of NASA TV

Editors' Recommendations

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
Meet NASA’s trio of mini moon rovers set to launch next year
Part of NASA’s CADRE technology demonstration, three small rovers that will explore the Moon together show off their ability to drive as a team autonomously – without explicit commands from engineers – during a test in a clean room at the agency’s Jet Propulsion Laboratory in December 2023.

NASA is ramping up its plans for exploring the moon, not only in terms of preparing to send astronauts there but also rovers. There's the VIPER rover, which will search for water around the lunar south pole, and now NASA is introducing a trio of mini rovers called CADRE, or Cooperative Autonomous Distributed Robotic Exploration. These will work together as a team to map the lunar surface, testing the possibilities of using rovers in groups for future exploration.

The rovers, developed at NASA's Jet Propulsion Laboratory, are just the size of a carry-on suitcase. They are designed to move independently but share data so they can cover more ground than a single rover could. They'll have to work over a lunar day, which is about two weeks, to map out features on the surface and look below ground using radar.

Read more
SpaceX sets target date for third test of world’s most powerful rocket
SpaceX's Super Heavy and Starship.

SpaceX is targeting next week for the third test flight of Starship, the world’s most powerful rocket.

The Elon Musk-led company said the Starship, which comprises the first-stage Super Heavy booster and the upper-stage Starship spacecraft, could launch “as soon as March 14,” though this depends on the Federal Aviation Administration handing it a launch permit in the coming days.

Read more
Crew-8 launches with small crack in capsule, but SpaceX says it’s safe
SpaceX Crew-8 launches to the space station in March 2024.

SpaceX successfully launched its Crew-8 members to the International Space Station (ISS) on Sunday night.

The Falcon 9 rocket carrying NASA astronauts Michael Barratt, Matthew Dominick, and Jeanette Epps, along with Roscosmos cosmonaut Alexander Grebenkin, blasted away from a Cape Canaveral launchpad in Florida just before 11 p.m. ET.

Read more