Skip to main content

NASA raises issue of dwindling astronaut numbers

As NASA looks toward expanding its crewed missions with launches to the moon in the next few years and ongoing trips to the International Space Station (ISS), the agency has voiced concerns over a possible lack of astronauts to help fulfill the missions.

In a recently published report by NASA’s Office of Inspector General titled “NASA’s Management of its Astronaut Corps,” the agency revealed that after reaching a peak of nearly 150 astronauts in 2000, the size of its corps currently stands at 44, describing it as “one of the smallest cadres of astronauts in the past 20 years.”

The report noted that NASA’s planning for the training and assigning of astronauts is currently shaped by ISS missions, but added that more ambitious crewed voyages to the moon and possibly even Mars mean the agency needs to reevaluate the way it prepares for such endeavors.

Analysis conducted by NASA several years ago revealed that its astronaut corps would dip below the minimum manifest requirement in fiscal years 2022 and 2023, a situation that prompted NASA to select 10 new astronaut candidates at the end of 2021. The new recruits are now beginning a rigorous two-year training program.

But the report said the current situation means NASA may not have enough additional astronauts available to make up for “unanticipated attrition and crew reassignments,” as well as ground roles such as leadership and liaison positions, and those serving as spokespeople for the agency.

It added: “In light of the expanding space flight opportunities anticipated for the Artemis missions, the corps might be at risk of being misaligned in the future, resulting in disruptive crew reorganizations or mission delays.”

The report also highlights concerns that at the current time, NASA may not be ready to make the necessary adjustments for new astronaut training programs for lunar missions that will be markedly different from stays on the ISS, a situation that could potentially see the first crewed moon mission — Artemis II — delayed beyond its current 2024 target date.

The report made several recommendations for NASA to address the issues, including more coordination between various bodies to improve mission training and planning, and evaluation of whether it needs to increase the 15% safety margin that it currently uses to calculate the minimum size of the astronaut corps for missions over the coming five years.

With more than 12,000 people applying to become NASA astronauts in the last hiring round, there’s clearly still much interest in space exploration as a career, suggesting that the space agency has a good chance of putting things right over time.

Editors' Recommendations

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA gives green light to mission to send car-sized drone to Saturn moon
An artist's impression of NASA's Dragonfly drone.

NASA’s Mars helicopter mission is now well and truly over, but following in its footsteps is an even more complex flying machine that's heading for Saturn’s largest moon.

The space agency on Tuesday gave the green light to the Dragonfly drone mission to Titan. The announcement means the design of the eight-rotor aircraft can now move toward completion, followed by construction and a testing regime to confirm the operability of the machine and its science instruments.

Read more
NASA needs a new approach for its challenging Mars Sample Return mission
An illustration of NASA's Sample Return Lander shows it tossing a rocket in the air like a toy from the surface of Mars.

NASA has shared an update on its beleaguered Mars Sample Return mission, admitting that its previous plan was too ambitious and announcing that it will now be looking for new ideas to make the mission happen. The idea is to send a mission to collect samples from the surface of Mars and return them to Earth for study. It's been a long-term goal of planetary science researchers, but one that is proving costly and difficult to put into practice.

The Perseverance rover has already collected and sealed a number of samples of Mars rock as it journeys around the Jezero Crater, and has left these samples in a sample cache ready to be collected.  However, getting them back to Earth in the previous plan required sending a vehicle to Mars, getting it to land on the surface, sending out another rover to collect the samples and bring them back, launching a rocket from the planet's surface (something which has never been done before), and then having this rocket rendezvous with another spacecraft to carry them back to Earth. That level of complexity was just too much to be feasible within a reasonable budget, NASA Administrator Bill Nelson announced this week.

Read more
Junk from the ISS fell on a house in the U.S., NASA confirms
The International Space Station.

A regular stanchion (left) and the one recovered from the NASA flight support equipment used to mount International Space Station batteries on a cargo pallet. The recovered stanchion survived reentry through Earth’s atmosphere on March 8, 2024, and impacted a home in Florida. NASA

When Alejandro Otero’s son called him on March 8 to say that something had crashed through the roof of their home, he initially thought it might have been a meteorite.

Read more